Back from Spring Break
My friends Walt, Sam, Mike, and Jake came down with the family to work on the lighthouse.
- We installed a landing platform so that Granddaddy and my scared aunts and anybody else can get easily from the boat to the lighthouse ladder in a single step.
- Walt and my Dad rewired the entire things, giving us lights, switches, sockets, control panels, etc.
- Sam and I drilled through solid steel and concrete on the outside to place these huge bolts which hold even huger 6x6s to the lighthouse for easy docking, a sliding mooring system, and even a swim ladder (to be installed).
- Granddad and Steve put in these beautiful portholes on one of the upper levels of the lighthouse.
- We hauled up some 1000 pounds of batteries for the future electric system.
- Sam and my Mom built the battery shelf in the basement. Sam, Mike, and I scraped the room of old paint. And Mike and I painted the battery closet.